OPERATIONS / PLANT OVERVIEW
Membrane capture plant
Live process visualization · Two-stage CO₂ separation
CONNECTINGWaiting for telemetry
FEED FLOWFI-101
—Nm³/h
Flue gas inlet—
INLET CO₂AI-102
—%
Feed composition—
CO₂ CAPTUREDFT-301
—kg/h
Model estimate—
PLANT POWERPT-401
—kW
Model estimate—
HCOOH EQUIVALENT
—kg/h
Calculated from formate conversion
CELL VOLTAGE / CURRENT
—V/cell
— A · summed cell equivalent
TOTAL ESTIMATED POWER
—kW
Electrolysis + acidification + concentration
SPECIFIC ENERGY / COST
—kWh/t
— EUR/t equivalent
PROCESS DIGITAL TWIN / 01
Plant schematic
MODEL —
CPT CO₂ CAPTURE
AVT ELECTROCHEMICAL CONVERSION
01FLUE GAS INLET— Nm³/h
02MEMBRANE STAGE 1Primary separation
03MEMBRANE STAGE 2Product polishing
04CO₂ PRODUCT— kg/h
DRAG TO ORBIT · SCROLL TO ZOOM
TELEMETRY HISTORY / 02
Operating trend
Feed flow CO₂ captured Power
Waiting for samples
RECENT OBSERVATIONS · EACH SERIES SCALED TO ITS OWN RANGE0 SAMPLES
SYNTHETIC INPUTS / ADVISORY SETPOINTS
Current and recommended
| Setpoint | Current | Recommended | Unit |
|---|
Regression waiting for causal history.
PERSISTED HISTORY / FIVE-MINUTE SAMPLES
AVT operating trend
Equivalent production Voltage Power
| UTC sample | kg/h equivalent | V/cell | kW | Quality |
|---|
Pipeline waitingModel waiting
Maintenance classifier pending: current synthetic configuration has insufficient maintenance events. All values use provisional notebook assumptions; experimental WP3 signals are not connected.